|
Automatic intermission
Generally generator used in these areas is not rated for continuous operation. The APP
can be run for certain number of hours and it needs to be shut down for a given period
before it is restarted. Auto BTS Site Alarm Manager controls these timings and these timings are user
programmable.
Automatic maintenance running
Sometimes the generator may not be required for weeks together. However, if the prime
mover is not run for long periods there are chances of the piston in cylinder to get
stuck/sticky. Hence the generator is run for some time whether it is required or not once in
few days. This period is settable and the Auto BTS Site Alarm Manager takes care of these maintenance runs.
Hysteresis in switching ON/OFF
Being a mechanical device with sufficient inertial the prime mover of the APP takes time to
totally shutdown and to start over again. The Prime mover should not be given rapid
commanded to start/stop. A programmable hysteresis in terms of minimum ON time is
provided in Auto BTS Site Alarm Manager . |